The 2017 release wasn't just a facelift; it introduced significant structural changes to align with other FIDIC forms:

The goal? To create a cohesive suite where the Consultant’s obligations match the rigors of the construction contracts they are often hired to administer.

Amendments to the standard clauses to fit local laws or specific project needs.

Claims cannot be made after the duration specified in the Contract Data (often linked to local statutes of limitation).